Roofing work
New roof installation
Specify the full assembly for the building and its desert exposure.
A new roof should be planned as an assembly: deck, insulation or underlayment, flashing, drainage and finished surface. We match tile, shingle or SPF to the roof slope, building use and requirements at the property.
-
Specify before work
The written scope identifies the proposed system, materials, timeline and cost. Site-specific code and product requirements guide the assembly.
-
Connect the details
Underlayment or insulation, flashings, edges and penetrations must work with the finished surface. Those connections are part of the installation scope.
-
Review the finished roof
The completed work is reviewed with you. Ask for applicable warranty coverage and a maintenance plan in writing.
Compare related roofing services
Before you plan the work
New roof installation questions.
How is a new roof system chosen?
Tile, shingle or SPF is matched to the roof slope, building use, deck and project requirements. Insulation or underlayment, flashing, drainage and the finished surface need to be specified as one assembly.
What should a new roof installation estimate describe?
The written scope should identify the proposed system, materials, connections, project requirements, timeline and cost. Edges, penetrations and flashing belong in the plan alongside the main roof surface.
What should I review when a new roof is completed?
Review the completed work, cleanup, applicable warranty coverage and maintenance expectations. Ask for the relevant terms and care plan in writing so the installed system and future responsibilities are clear.
Know what your
roof needs.
Free written estimate. No obligation.
California
(442) 637-5222Arizona
(480) 978-5147Coachella Valley + Greater Phoenix
A 50-mile Phoenix radius, including Buckeye.
Service hours
- Mon–Fri
- 7:00 AM – 7:00 PM
- Sat
- 8:00 AM – 5:00 PM
- Sun
- Closed